4 min read Published October 2026

Drawing Checker makes a drawing set fire NOC worthy. Built by Siya Habitats Pvt. Ltd., the technology and services division of IFE, Nagpur, it checks the architect's drawings against every fire NOC requirement for the building, cites the clause for each gap, and drafts the fire safety details onto the architect's own sheets. It is deployed and running on live drawing sets, delivering NOC-worthy drawings.

Key takeaways

  • Drawing Checker checks a fire NOC drawing set against every requirement for the building.
  • Every gap is listed with its clause, so it can be fixed before submission.
  • It works to NBC 2016, NBCS 2026 and the binding state fire rules.
  • Siya Habitats delivers NOC-worthy drawings and a NOC-worthy solution.

Why are fire NOC drawings hard to check by hand?

A submission is checked against a state schedule, a national code and the standards they call up, and the binding requirement depends on the building's occupancy and height. A 14 m office and a 46 m apartment tower need different systems, tank sizes and pump duties. Get the occupancy or the height wrong at the start, and every check after it is made against the wrong requirement.

Done by hand, that means a person reading every sheet, cross-checking every row of the schedule and every clause of the code, for every submission. It is slow, and a missed item usually comes back as a revision.

What must a fire NOC drawing set show?

Usually, the set includes:

  • a site plan with fire vehicle access, the yard hydrant ring main, and the tank and fire brigade inlet positions;
  • ground, typical, differing, basement and terrace floor plans, each showing the fire protection;
  • sections and an elevation showing floor levels and the height to the terrace;
  • a riser or down-comer schematic, floor by floor;
  • tank and pump details stating capacities and duties;
  • a legend for every symbol, with scale and sheet numbering.

The local fire department may ask for more. In Maharashtra, section 3(1) of the Fire Prevention and Life Safety Measures Act, 2006, as substituted in 2023, requires measures not less than Part 4 of the National Building Code and not less than Schedule I of the Act, and where the two differ the stricter governs. Siya Habitats lists each item with its clause in its fire NOC drawing checklist.

What does Drawing Checker do?

It does the checking work in one pass:

  • it works out what the building needs for its fire NOC;
  • it checks the drawing set against those requirements, citing the clause for each one;
  • it lists every gap, so it can be fixed before submission;
  • it drafts the fire safety details onto the architect's own sheets.

The checks run against NBC 2016, NBCS 2026 and the binding state rules. The outcome is a NOC-worthy drawing set: from the architect's sheets to drawings that are ready to go in.

Who is Drawing Checker for?

Anyone preparing or reviewing a fire NOC submission: the architect who drew the building, the owner or developer who needs the approval, and the fire consultant who prepares the fire safety drawings. Each of them gains the same thing, which is knowing every gap and its clause before the set goes to the fire department, not after.

Can a drawing check guarantee a fire NOC?

No drawing check can guarantee a fire NOC. What Drawing Checker delivers is a NOC-worthy drawing set, with every gap found and cited before it goes in. Siya Habitats delivers NOC-worthy drawings and a NOC-worthy solution, so the submission starts from a set that already meets the code it will be judged against.

Why does this matter for fire safety design and education?

At IFEM, fire safety is taught around the National Building Code 2016 and the state rules that make it binding. Reading a drawing against those rules, sheet by sheet and clause by clause, is the skill behind every good submission. Drawing Checker applies that discipline to every set and shows which rule applies, which clause it comes from, and what still needs to change.

Read the full page on Drawing Checker for fire NOC drawing checks, or read about Siya Habitats, IFE's technology and services division. Siya Habitats invites owners and consultants to send a drawing set and will walk them through what it finds.

What do people ask about Drawing Checker?

What drawings are required for a fire NOC?

Usually a site plan with fire vehicle access and the hydrant main, all floor plans showing the fire protection, sections and elevation, a riser or down-comer schematic, tank and pump details, and a legend. The local fire department may ask for more.

Which rules does Drawing Checker check against?

NBC 2016, NBCS 2026 and the binding state fire rules, with the clause cited for every requirement.

What does Drawing Checker deliver?

A NOC-worthy drawing set: every gap found and cited before submission, with the fire safety details drafted onto the architect's own sheets.

What is the status of Drawing Checker?

It is deployed and running on live drawing sets, delivering NOC-worthy drawings.